Home > NRC Library > ADAMS Public Documents
Nine Mile Point Nuclear Station, Unit 2 - Submittal of Extended Power Uprate Steam Dryer Power Ascension Testing Information in Accordance with Operating License Conditions 2.C.(20)(b)5 and 2.C.(20)(e).
Accession Number: ML122840230
Date Released: Thursday, October 18, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12284A182 - Nine Mile Point Nuclear Station, Unit 2 - Submittal of Extended Power Uprate Steam Dryer Power Ascension Testing Information in Accordance with Operating License Conditions 2.C.(20)(b)5 and 2.C.(20)(e). (8 page(s), 9/26/2012)
- ML12284A184 - Attachment 3, Final EPU Steam Dryer Load Definition CDI Report No. 12-20NP, "Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1". (47 page(s), 9/30/2012)
- ML12284A185 - Attachment 4, Steam Dryer Limit Curves CDI Technical Note No. 12-13NP, "Limit Curves with ACM Rev. 4.1 for the 100% Power Level Basis at Nine Mile Point, Unit 2," Revision 1. (207 page(s), 6/30/2012)