Home > NRC Library > ADAMS Public Documents
Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1.
Accession Number: ML122490612
Date Released: Wednesday, September 12, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12249A424 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1. (3 page(s), 8/31/2012)
- ML12249A432 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 1, Introduction and General Description of the Plant. (419 page(s), 8/31/2012)
- ML12249A434 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Table of Contents. (22 page(s), 8/31/2012)
- ML12249A435 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2.0, Site Characteristics Through Table 2.0-203 (Sheet 10 of 10). (23 page(s), 8/31/2012)
- ML12249A436 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Section 2.1 Geography and Demography Through Figure 2.1-217 Low Population Zone. (23 page(s), 8/31/2012)
- ML12249A437 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Section 2.2 Identification of Potential Hazards in Site Vicinity Through Figure 2.2-204 Corridor Analysis. (32 page(s), 8/31/2012)
- ML12249A438 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Section 2.3 Meteorology Through Figure 2.3-215 (Sheet 4 of 4) Terrain Elevation Profiles Within 50 Miles of the VEGP Site. (124 page(s), 8/31/2012)
- ML12254A944 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Appendix 2.4A - Observation Well Installation and Development Report. (231 page(s), 8/31/2012)
- ML12254A946 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Section 2.5 Geology, Seismology, and Geotechnical Engineering Through Figure 2.5-397 Comparison of Damping Ratio Curves - Lower Sands. (473 page(s), 8/31/2012)
- ML12254A947 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Appendix 2.5A - Geotechnical Investigation and Laboratory Testing Data Report - ESP. (1 page(s), 8/31/2012)
- ML12254A948 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Appendix 2.5B - High Resolution Compressional Seismic Survey Field Report. (1 page(s), 8/31/2012)
- ML12254A949 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Appendix 2.5C - Geotechnical Investigation and Laboratory Testing Data Report - COL. (1 page(s), 8/31/2012)
- ML12254A941 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Appendix 2.5D - Engineered Fill Below Grade Test Pad, Phase 1. (1 page(s), 8/31/2012)
- ML12254A942 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 2, Appendix 2.5E - AP1000 Vogtle Site Specific Seismic Evaluation Report. (93 page(s), 8/31/2012)
- ML12254A966 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, UFSAR Table of Contents. (26 page(s), 8/31/2012)
- ML12254A967 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.1, Conformance with Nuclear Regulatory Commission General Design Criteria. (29 page(s), 8/31/2012)
- ML12254A968 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.2, Classification of Structures, Components, and Systems. (94 page(s), 8/31/2012)
- ML12254A969 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.3, Wind and Tornado Loadings. (6 page(s), 8/31/2012)
- ML12254A970 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.4, Water Level (Flood) Design. (24 page(s), 8/31/2012)
- ML12254A971 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.5, Missile Protection. (20 page(s), 8/31/2012)
- ML12254A973 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.6, Protection Against the Dynamic Effects Associated with the Postulated Rupture of Piping. (50 page(s), 8/31/2012)
- ML12254A962 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.7, Seismic Design. (110 page(s), 8/31/2012)
- ML12254A964 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.8, Design of Category I Structures. (184 page(s), 8/31/2012)
- ML12254A965 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.9, Mechanical Systems and Components. (161 page(s), 8/31/2012)
- ML12254A974 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.10, Seismic and Dynamic Qualification of Seismic Category I Mechanical and Electrical Equipment. (7 page(s), 8/31/2012)
- ML12254A984 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 3, Section 3.11, Environmental Qualification of Mechanical and Electrical Equipment. (57 page(s), 8/31/2012)
- ML12254A985 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Appendix 3A, HVAC Ducts and Duct Supports. (3 page(s), 8/31/2012)
- ML12254A986 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Appendix 3B, Leak-Before-Break Evaluation of the AP1000 Piping. (40 page(s), 8/31/2012)
- ML12254A988 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Appendix 3C, Reactor Coolant Loop Analysis Methods. (4 page(s), 8/31/2012)
- ML12254A989 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Appendix 3D, Methodology for Qualifying AP1000 Safety-Related Electrical and Mechanical Equipment. (107 page(s), 8/31/2012)
- ML12254A990 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Appendix 3E, High-Energy Piping in the Nuclear Island. (10 page(s), 8/31/2012)
- ML12254A991 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Appendix 3F, Cable Trays and Cable Tray Supports. (3 page(s), 8/31/2012)
- ML12254A992 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Appendix 3G, Nuclear Island Seismic Analyses. (75 page(s), 8/31/2012)
- ML12254A993 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Section 3GG, SSI Analysis of AP1000 at Vogtle Site Using NI15 Model. (35 page(s), 8/31/2012)
- ML12254A994 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Section 3H, Auxiliary and Shield Building Critical Sections. (78 page(s), 8/31/2012)
- ML12254A987 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Section 3I, Evaluation for High Frequency Seismic Input. (72 page(s), 8/31/2012)
- ML12254A998 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 04, Table of Contents. (192 page(s), 8/31/2012)
- ML12254B001 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 05, Table of Contents. (196 page(s), 8/31/2012)
- ML12254B003 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 06, Table of Contents. (273 page(s), 8/31/2012)
- ML12254B009 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 07, Instrumentation and Controls. (185 page(s), 8/31/2012)
- ML12254B019 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 08, Electric Power. (90 page(s), 8/31/2012)
- ML12254B020 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 09, Auxiliary Systems. (582 page(s), 8/31/2012)
- ML12254B021 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 10, Steam and Power Conversion. (139 page(s), 8/31/2012)
- ML12254B024 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 11, Radioactive Waste Management. (179 page(s), 8/31/2012)
- ML12254B031 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 12, Radiation Protection. (200 page(s), 8/31/2012)
- ML12254B033 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 13, Conduct of Operation. (163 page(s), 8/31/2012)
- ML12254B035 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 14, Initial Test Program. (194 page(s), 8/31/2012)
- ML12254B043 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 15, Accident Analyses. (639 page(s), 8/31/2012)
- ML12254B046 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 16, Technical Specifications. (54 page(s), 8/31/2012)
- ML12254B051 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 17, Quality Assurance. (36 page(s), 8/31/2012)
- ML12254B055 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 18, Human Factors Engineering. (82 page(s), 8/31/2012)
- ML12254B059 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1, Chapter 19, Probabilistic Risk Assessment. (389 page(s), 8/31/2012)