Home > NRC Library > ADAMS Public Documents
June 27, 2012 Meeting Summary.
Accession Number: ML12200A091
Date Released: Thursday, August 2, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12200A103 - Letter to Lost Creek Transmitting June 27, 2012 Meeting Summary. (2 page(s), 7/25/2012)
- ML12200A128 - Attachment 3 - Verification Issues. (2 page(s), 7/25/2012)
- ML12200A140 - Staff Verification of the Vertical Anisotropy to the HJ Horizon Lost Creek Wyoming. (24 page(s), 7/25/2012)
- ML12200A148 - Extent of Mudstones between HJ Subhorizons. (9 page(s), 7/25/2012)
- ML12200A152 - Effect of Fully Penetrating Wells. (10 page(s), 7/25/2012)
- ML12200A158 - 25 Foot Radius of Influence for Line Drives. (5 page(s), 7/25/2012)
- ML12200A160 - Static Potentiometric Surface Contour Map Figure 1. (1 page(s), 7/25/2012)
- ML12200A175 - Steady State Zone 3 Potentiometric Surface Contour Map with Zone 4 Wells Operating and 2 year Pathlines figure 2. (1 page(s), 7/25/2012)
- ML12200A191 - Licencee's Potentiometric Surface Contour Map after 457.5 days Figure 3. (1 page(s), 7/25/2012)
- ML12200A204 - Steady State Zone 3 Potentiometric Surface Contour Map with Zone 4 Figure 4. (1 page(s), 7/25/2012)
- ML12201A273 - Appendix 8-Staff Notes during June 27, 2012 Teleconference.pdf (10 page(s), 5/22/2009)