Home > NRC Library > ADAMS Public Documents
NUREG 1537 - Final Interim Staff Guidance Augmenting NUREG-1537, Guidelines for Preparing and Reviewing Applications for for the Licensing of Non-Power Reactors" Parts 1 and 2, for Licensing Radioisotope Production Facilities and AHRs.
Accession Number: ML12156A053
Date Released: Monday, August 25, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12156A061 - NUREG-1537 - Responses to Public Comments on Draft Interim Staff Guidance Augmenting NUREG-1537, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, Parts 1 and 2, for the Production of Radioisotopes (66 page(s), 10/17/2012)
- ML12156A069 - NUREG-1537 - Final ISG Augmenting NUREG-1537, Part 1 Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content, for Licensing Radioisotope Production Facilities and AHRs October 17, 2012. (136 page(s), 10/17/2012)
- ML12156A075 - NUREG-1537-Final ISG Augmenting NUREG-1537, Part 2 Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: SRP and Acceptance Criteria,for Licensing Radioisotope Production Facilities and AHRs October 17, 2012. (223 page(s), 10/17/2012)
- ML12156A056 - FRN: General Notice. Final Interim Staff Guidance Augmenting NUREG-1537, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, Parts 1 and 2, for the Production of Radioisotopes. (4 page(s), 10/17/2012)