Home > NRC Library > ADAMS Public Documents
Seabrook-10CFR50.59 Report, Rev. 13 to the Updated Final Safety Analysis Report, Rev. 10 to Appendix R, "Fire Protection Safe Shutdown Capability," Rev. 11 to Appendix A, "Evaluation and Comparison to BTP APCSB 9.5-1," & Rev. 119 to Technical....
Accession Number: ML120870304
Date Released: Tuesday, April 26, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12087A143 - Seabrook-10CFR50.59 Report, Rev. 13 to the Updated Final Safety Analysis Report, Rev. 10 to Appendix R, "Fire Protection Safe Shutdown Capability," Rev. 11 to Appendix A, "Evaluation and Comparison to BTP APCSB 9.5-1," & Rev. 119 to Technical.... (22 page(s), 5/5/2010)
- ML12087A149 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Chapter 2, Site Characteristics, Appendix 2A through Appendix 2Q. (1005 page(s), 5/5/2010)
- ML12087A194 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Chapter 3, Design of Structures, Components, Equipment and Systems through Appendix 3H. (1028 page(s), 5/5/2010)
- ML12087A195 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Chapter 3, Design of Structures, Components, Equipment and Systems, Appendix 3I through Table 6.8-2. (933 page(s), 5/5/2010)
- ML12087A150 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Chapter 10, Steam and Power Conversion System through Chapter 17, Figure 17.2-1. (1186 page(s), 5/5/2010)
- ML12087A147 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Drawings 1-BRS-B20860, "Boron Recovery System Evaporation Detail," through 1-EX-B20324, "Extraction Steam Overview." (74 page(s), 5/5/2010)
- ML12087A193 - Seabrook, Technical Requirements Manual, Revision 119. (201 page(s), 5/5/2010)
- ML16200A348 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Drawings Legend1, "Lead Sheet Nuclear Piping & Instrument Diagrams," through 1-NHY-202053, "Turbine Building Plan - Mezzanine Floor EL. 46'-9" and 50'-0" General Arrangement." - Redacted. (40 page(s), 5/5/2010)
- ML16200A351 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Drawings 1-RC-B20841, "Reactor Coolant System Loop No. 1" through 1-NHY-310107, "125V DC BUS 1-SWG-11A Distr Panel 1-PP-111A Schedule Sh. 90." - Redacted. (101 page(s), 5/5/2010)
- ML16200A412 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Drawings 1-NHY-310107, "125V DC Bus I-SWG-11B Distr Panel I-PP-111B Schedule Sh. 93." through 1-BRS-B20859, "Boron Recovery System Evaporation Detail." - Redacted. (90 page(s), 5/5/2010)
- ML16200A416 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Cover through Chapter 2, Site Characteristics, Figure 2.5-71 - Redacted. (1069 page(s), 5/5/2010)
- ML16200A421 - Seabrook, Evaluation and Comparison to BTP APCSB 9.5-1, Appendix A, Revision 11 - Redacted. (1292 page(s), 5/5/2010)
- ML16200A422 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Chapter 6, Engineered Safety Features, Figures 6.2-1 through Figure 9.5-14 - Redacted. (1425 page(s), 5/5/2010)
- ML16200A425 - Seabrook, Updated Final Safety Analysis Report, Revision 13, Drawings 1-EX-B20328, "Extraction Steam Main Turbine & Steam Piping Drains (MSO)," through 1-NHV-500090, "Control Building Control Room Arrangement Plant at Elev. 75'-0" - Redacted. (75 page(s), 5/5/2010)