Home > NRC Library > ADAMS Public Documents
Brunswick Steam Electric Plant, Units 1 & 2 - Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Technical Specification 2.1.1.
Accession Number: ML120760256
Date Released: Monday, March 26, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12076A062 - Brunswick Steam Electric Plant, Units 1 & 2 - Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Technical Specification 2.1.1.2. (34 page(s), 3/6/2012)
- ML12076A063 - AREVA Document No. 51-9177317-000, "Brunswick Unit 1 Cycle 19 SLMCPR Analysis With SAFLIM3D Methodology, Engineering Information Record," Enclosure 8 to BSEP 12-0031. (15 page(s), 2/17/2012)
- ML12076A064 - AREVA Document No. 51-9177315-000, "Brunswick Unit 1 Cycle 19 SLMCPR Analysis With SAFLIM3D Methodology - Operability Assessment," Enclosure 11 to BSEP 12-0031. (15 page(s), 2/17/2012)
- ML12076A085 - AREVA Document No. 51-9177314-000, "Brunswick Unit 2 Cycle 20 SLMCPR Analysis With SAFLIM3D Methodology," Enclosure 14 to BSEP 12-0031. (15 page(s), 2/17/2012)
- ML12076A086 - AREVA Document No. 51-9177316-000, "Brunswick Unit 2 Cycle 20 SLMCPR Analysis With SAFLIM3D Methodology - Operability Assessment," Enclosure 17 to BSEP 12-0031. (17 page(s), 2/17/2012)
- ML12076A087 - AREVA Document ANP-3086(NP), "Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for ATRIUM 10XM Fuel - Improved K-factor Model," Enclosure 20 to BSEP 12-0031. (42 page(s), 2/29/2012)