Home > NRC Library > ADAMS Public Documents
Proposed Turkey Point, Units 6 and 7 - Submittal of Underground Injection Control Exploratory Well Weekly Construction Summaries - #40, #41, and #42.
Accession Number: ML120690304
Date Released: Monday, March 19, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12069A135 - Proposed Turkey Point, Units 6 and 7 - Submittal of Underground Injection Control Exploratory Well Weekly Construction Summaries - #40, #41, and #42. (2 page(s), 3/7/2012)
- ML12069A136 - Enclosure 1 to L-2012-087, Turkey Point, Units 6 & 7 - Exploratory Well Project; Permit #0293962-001-UC Weekly Construction Summary #40 dated February 10, 2012. (38 page(s), 3/7/2012)
- ML12069A138 - Enclosure 2 to L-2012-087, Turkey Point, Units 6 & 7 - Exploratory Well Project; Permit #0293962-001-UC, Weekly Construction Summary #41 dated February 17, 2012. (57 page(s), 3/7/2012)
- ML12069A139 - Enclosure 3 to L-2012-087, Turkey Point, Units 6 & 7 - Exploratory Well Project; Permit #0293962-001-UC, Weekly Construction Summary #42 dated February 24, 2012. (45 page(s), 3/7/2012)