Home > NRC Library > ADAMS Public Documents
Memo to M. Water Re: Summary of January 10, 2012, Public Meeting with Exelon, LLC to Discuss Approach to Unrestrained Stack-Up Operations at the Upcoming Loading Campaign at Byron Nuclear Station (Byron).
Accession Number: ML120481631
Date Released: Monday, February 27, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML120481708 - 01/10/2012 Summary of Meeting with Exelon, LLC to Discuss Approach to Unrestrained Stack-Up Operations at the Upcoming Loading Campaign at Byron Nuclear Station (Byron), Enclosure 1 - Meeting Attendees, Enc 2- Agenda. (8 page(s), 2/17/2012)
- ML120090302 - Presentation Slides - January 10, 2012, Public Meeting with Exelon - Discussion of Plans to Support Unrestrained Stack-up Operations for the Upcoming Dry Fuel Storage Campaign at Byron, Docket Nos. 50-54, 50-455, 72-68, TAC L24611. (25 page(s), 1/10/2012)
- ML120130560 - Ltr. to John Goshen Re: Technical Information Exchange Meeting on the Stability Analysis of Freestanding Stack-Up Configurations - Re Transmittal of Technical Memo. (26 page(s), 11/22/2011)
- ML120520125 - Enclosure 5 - Additional Topics Discussed, SFST Public Meeting with Exelon, LLC. (1 page(s), 2/17/2012)