Home > NRC Library > ADAMS Public Documents
FOIA/PA-2012-0065 - Resp 1 - Final.
Accession Number: ML120380447
Date Released: Tuesday, February 14, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12038A206 - FOIA/PA-2012-0065 - Resp 1 - Final. (1 page(s), 2/6/2012)
- ML091320338 - Indian Point, Units 2 & 3, Reply to Request for Additional Information - Open Items. (49 page(s), 5/1/2009)
- ML021070811 - Davis-Besse NRC Augmented Inspection Team Exit Meeting Slides - April 5, 2002 (21 page(s), 4/5/2002)
- ML023530645 - 11/26/2002 Meeting Slides Used by First Energy Nuclear Operating Co Re Davis-Besse Reactor Vessel Incore Monitoring Instrumentation Nozzles, Inspection & Potential for Leakage. (32 page(s), 11/26/2002)
- ML12038A202 - Picture of Water Leaking at the Byron Plant. (1 page(s), 10/31/2007)
- ML12038A203 - Picture of Damaged Davis-Besse Reactor Vessel Head 2010. (1 page(s), 3/13/2010)
- ML12038A204 - Picture of the Collapse and Water Leakage from the Vermont Yankee Cooling Tower. (1 page(s), 8/31/2007)
- ML12038A205 - Picture of Water Leaking from the Vermont Yankee Plant Pipe. (1 page(s), 7/31/2008)