Home > NRC Library > ADAMS Public Documents
FY12(09/12) - 50333 Fitzpatrick Initial OL Exam (Fac Dev) (U01879).
Accession Number: ML120270122
Date Released: Monday, June 29, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML120310565 - James A. FitzPatrick Nuclear Power Plant - Notification of NRC Initial Licensing Examination 05000333/2012-302. (4 page(s), 1/31/2012)
- ML12250A011 - Initial Operator Licensing Operating Test and Written Examination Approval (James A. FitzPatrick Nuclear Power Plant). (3 page(s), 8/29/2012)
- ML122710023 - Fitzpatrick - Final Written Examination with Answer Key (401-5 Format) (Folder 2). (155 page(s), 8/20/2012)
- ML122710026 - Fitzpatrick - Final Operating Exam (Sections A, B, and C) (Folder 3). (150 page(s), 8/29/2012)
- ML122710033 - Fitzpatrick - Post Exam Analysis. (1 page(s), 9/27/2012)
- ML122750357 - Fitzpatrick - Final Outlines (Folder 3). (19 page(s), 8/9/2012)
- ML122750389 - James A. FitzPatrick NPP, Initial License Examination Outlines. (25 page(s), 6/21/2012)
- ML122750393 - Fitzpatrick - NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2). (7 page(s), 7/26/2012)
- ML122750396 - Fitzpatrick - Draft Written Exam (Folder 2). (155 page(s), 7/20/2012)
- ML122750409 - Fitzpatrick - Draft Operating Exam (Sections A, B, and C). (188 page(s), 7/20/2012)
- ML122750422 - Fitzpatrick - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2). (4 page(s), 7/13/2012)
- ML12279A015 - IR 05000333-12-302; Entergy Operations; 09/10-28/2012; James A. FitzPatrick Nuclear Power Plant, NRC Examination Report. (9 page(s), 10/4/2012)
- ML12356A250 - Fitzpatrick - Final QA/Related Forms (Folder 1). (13 page(s), 10/4/2012)