Home > NRC Library > ADAMS Public Documents
Watts Bar Nuclear Plant, Unit 2 - Instrumentation and Controls Staff Information Requests.
Accession Number: ML120180434
Date Released: Tuesday, June 19, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12018A213 - Watts Bar Nuclear Plant, Unit 2 - Instrumentation and Controls Staff Information Requests. (45 page(s), 12/22/2011)
- ML12018A214 - Attachment 3 - TVA Calculation EPM-MCP-071689, "Cooling/Heating Load & Equipment/Component Performance Analysis for the Control Building Electrical Board Room Areas (EL. 692.0 & 708.0)," Revision 21. (Letter Item 4, SSER 23 Appendix HH Item Number 108). (592 page(s), 12/22/2011)
- ML12018A215 - Attachment 4 - TVA Calculation EPM-LCP-072489, "Cooling and Heating Load Analysis, Main Control Room HVAC," Revision 14 (Letter Item 4, SSER 23 Appendix HH Item Number 108). (335 page(s), 8/14/2011)
- ML12018A216 - Attachment 6 - WEC Non-Proprietary Document EQ-QR-68-WBT-NP, "Qualification Summary Report for Post-Accident Monitoring System (PAMS)," Revision 0 (Letter Item 4, SSER 23 Appendix HH Item Number 108). (184 page(s), 2/28/2011)
- ML12018A217 - Attachment 8 - TVA Design Criteria Document WB-DC-40-24, "Radiation Monitoring (Unit 1 /Unit 2)," Revision 24, dated November 30, 2011 (Letter Item 6). (90 page(s), 11/22/2011)