Proposed Turkey Point, Units 6 and 7 - Submittal of Underground Injection Control Exploratory Well Weekly Construction Summaries - #28, #29, and #30.
Accession Number: ML113540673
Date Released: Friday, December 30, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11355A058 - Proposed Turkey Point Units 6 and 7 - Submittal of Underground Injection Control Exploratory Well Weekly Construction Summaries - #28, #29, and #30. (2 page(s), 12/15/2011)
- ML11354A364 - Enclosure 1 to L-2011-538, Turkey Point, Units 6 & 7, Exploratory Well Project; Permit #0293962-001-UC, Weekly Construction Summary #28 dated November 18, 2011. (62 page(s), 11/18/2011)
- ML11354A365 - Enclosure 3 to L-2011-538, Turkey Point, Units 6 & 7, Exploratory Well Project; Permit #0293962-001-UC, Weekly Construction Summary #30 dated December 2, 2011 Through Page 49. (49 page(s), 12/2/2011)
- ML11354A366 - Enclosure 3 to L-2011-538, Turkey Point, Units 6 & 7, Exploratory Well Project; Permit #0293962-001-UC, Weekly Construction Summary #30 dated December 2, 2011 Through Page 89. (40 page(s), 12/2/2011)
- ML11354A362 - Enclosure 3 to L-2011-538, Turkey Point, Units 6 & 7, Exploratory Well Project; Permit #0293962-001-UC, Weekly Construction Summary #30 dated December 2, 2011 Through Page 124. (35 page(s), 12/2/2011)