Home > NRC Library > ADAMS Public Documents
Forwards Insp Rept 50-263/84-26 on 841030-850208,notice of violation,EL Jordan 810824 memo re guidance for sys to be vented & drained during integrated leakage rate testing,per App J & R Mattson 820111 memo re App J requirements.
Accession Number: ML113202061
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML113202060 - Forwards Insp Rept 50-263/84-26 on 841030-850208,notice of violation,EL Jordan 810824 memo re guidance for sys to be vented & drained during integrated leakage rate testing,per App J & R Mattson 820111 memo re App J requirements. (2 page(s), 4/11/1985)
- ML113202062 - Notice of violation from insp on 841030-850208. (2 page(s), 4/12/1985)
- ML113202063 - Insp Rept 50-263/84-26 on 841030-850208.Noncompliance noted: failure to have adequate containment integrated leak rate test & failure to correctly total isolation valve leakages, per Tech Specs. (11 page(s), 4/12/1985)
- ML120170462 - Submits general guidance for venting & draining of sys during integrated leakage rate testing,per requirements of App J,Section III.A.1.d. (8 page(s), 8/24/1981)