Home > NRC Library > ADAMS Public Documents
South Texas Project, Units 1 and 2 - License Renewal Application Revised Scoping Drawings.
Accession Number: ML113180420
Date Released: Tuesday, November 22, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11318A121 - South Texas Project, Units 1 and 2 - License Renewal Application Revised Scoping Drawings. (8 page(s), 11/3/2011)
- ML11318A122 - Drawing No. LR-STP-AF-5S141F00024-1, Rev. 1, "Piping & Instrumentation Diagram Auxiliary Feedwater". (1 page(s), 11/3/2011)
- ML11318A123 - Drawing No. LR-STP-AF-5S142F00024-1, Rev. 1, "Piping & Instrumentation Diagram Auxiliary Feedwater". (1 page(s), 11/3/2011)
- ML11318A124 - Drawing No. LR-STP-BR-7R189F05010#1, Rev. 1, "Piping & Instrumentation Diagram Boron Recycle System". (1 page(s), 11/3/2011)
- ML11318A125 - Drawing No. LR-STP-BR-7R189F05010#2, Rev. 1, "Piping and Instrumentation Diagram Boron Recycle System". (1 page(s), 11/3/2011)
- ML11318A126 - Drawing No. LR-STP-BR-7R189F05011#1, Rev. 1, "Piping and Instrumentation Diagram Boron Recycle System". (1 page(s), 11/3/2011)
- ML11318A127 - Drawing No. LR-STP-BR-7R189F05011#2, Rev. 1, "Piping and Instrumentation Diagram Boron Recycle System". (1 page(s), 11/3/2011)
- ML11318A128 - Drawing No. LR-STP-CC-5R209F05020#1, Rev. 1, "Piping and Instrumentation Component Cooling Water System". (1 page(s), 11/3/2011)
- ML11318A129 - Drawing No. LR-STP-CC-5R209F05020#2, Rev. 1, "Piping and Instrumentation Diagram Component Cooling Water System". (1 page(s), 11/3/2011)
- ML11318A130 - Drawing No. LR-STP-CT-5S199F00020#1, Rev. 1, "Piping and Instrumentation Diagram Condensate Storage". (1 page(s), 11/3/2011)
- ML11318A131 - Drawing No. LR-STP-CT-5S199F00020#2, Rev. 1, "Piping and Instrumentation Diagram Condensate Storage". (1 page(s), 11/3/2011)
- ML11318A132 - Drawing LR-STP-CV-5R179F05008#1, Rev. 1, "Piping and Instrumentation Diagram Chemical and Volume Control System Btrs Sub System". (1 page(s), 11/3/2011)
- ML11318A133 - Drawing No. LR-STP-CV-5R179F05008#2, Rev. 16, "Piping an Instrumentation Diagram Chemical and Volume System Birs Sub System." (1 page(s), 11/3/2011)
- ML11318A135 - Drawing No. LR-STP-CV-5R179F05009, Rev. 22, "Piping and Instrumentation Diagram Chemical and Volume Control System." (1 page(s), 11/3/2011)
- ML11318A136 - Drawing LR-STP-CV-5R179F05009 #2, Rev. 21, "Piping and Instrumentation Diagram Chemical and Volume Control System." (1 page(s), 11/3/2011)
- ML11318A138 - Drawing LR-DTP-DG-5Q159F22546 #1, Rev. 21, "Piping & Instrumentation Diagram Standby Diesel Starting Air." (1 page(s), 11/3/2011)
- ML11318A139 - Drawing LR-STP-DG-5Q159F22546 #2, Rev. 15, "Piping & Instrumentation Diagram Standby Diesel Starting Air." (1 page(s), 11/3/2011)
- ML11318A140 - Drawing LR-STP-CV-159F00045 #1, Rev. 32, "Piping & Instrumentation Diagram Standby Diesel Generator Fuel Oil Storage & Transfer System." (1 page(s), 11/3/2011)
- ML11318A141 - Drawing LR-STP-DG-5Q159F00045 #2-1, Rev. 30, "Piping & Instrumentation Diagram Standby Diesel Generator Fuel Oil Storage & Transfer System." (1 page(s), 11/3/2011)
- ML11318A142 - Drawing LR-STP-DR-6Q069F20005 #2, Rev. 25, "Piping and Instrument Diagram Non-Radioactive Drains Mech. and Elec. Aux. Bldg. and Turbine Gen. Bldg." (1 page(s), 11/3/2011)
- ML11318A143 - Drawing LR-DTP-DW-5S199F05034 #1, Rev. 15, "Piping & Instrumentation Diagram Demineralized Water Distribution System Rcb. Fhb and Meab." (1 page(s), 11/3/2011)
- ML11318A144 - Drawing LR-STP-DW-5S199F05034 #2, Rev. 14, "Piping & Instrument Diagram Demineralized Water Distribution System Rcb Fhb, and Mead." (1 page(s), 11/3/2011)
- ML11318A145 - Drawing LR-STP-ED-5Q069F05030 #1, Rev. 18, "Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps." (1 page(s), 11/3/2011)
- ML11318A146 - Drawing LR-STP-ED-5Q069F05030 #2, Rev. 17, "Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps." (1 page(s), 11/3/2011)
- ML11318A147 - Drawing No. LR-STP-ED-5Q069F90011#1, Revision 1, "Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains." (1 page(s), 11/3/2011)
- ML11318A148 - Drawing No. LR-STP-ED-5Q069F90011#2, Revision 1, "Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains." (1 page(s), 11/3/2011)
- ML11318A149 - Drawing No. LR-STP-ED-7Q069F90016#1, Revision 1, "Piping & Instrumentation Diagram Radioactive Vent and Drain System Mab Floor Drains El. 41'-0" and Above." (1 page(s), 11/3/2011)
- ML11318A150 - Drawing No. LR-STP-ED-7Q069F90016#2, Revision 1, "Piping & Instrumentation Diagram Radioactive Vent and Drain System Mab Floor Drains El. 41'-0" and Above." (1 page(s), 11/3/2011)
- ML11318A151 - Drawing No. LR-STP-EW-5R289F05038#1-3, Revision 1, "Piping & Instrumentation Diagram Essential Cooling Water System Train 1C." (1 page(s), 11/3/2011)
- ML11318A152 - Drawing No. LR-STP-EW-5R289F05038#2-1, Revision 1, "Piping & Instrumentation Diagram Essential Cooling Water System Train 2A. (1 page(s), 11/3/2011)
- ML11318A153 - Drawing No. LR-STP-FC-5R219F05029#1, Revision 1, "Piping & Instrumentation Diagram Spent Fuel Pool Cooling & Cleanup System." (1 page(s), 11/3/2011)
- ML11318A154 - Drawing No. LR-STP-FC-5R219F05029#2, Revision 1, "Piping & Instrumentation Diagram Spent Fuel Pool Cooling & Cleanup System." (1 page(s), 11/3/2011)
- ML11318A155 - Drawing No. LR-STP-FP-7Q272F00046, Rev. 1, "Piping and Instrumentation Diagram Fire Protection Loop." (1 page(s), 11/3/2011)
- ML11318A156 - Drawing No. LR-STP-IA-8Q119F00048#1-1, Rev. 1, "Piping & Instrumentation Diagram Instrument Air/Service Air Compressors & Distribution." (1 page(s), 11/3/2011)
- ML11318A157 - Drawing No. LR-STP-IA-8Q119F00048#1-2, Rev. 1, "Piping and Instrumentation Diagram Instrument Air Dryers 11, 12 & 13." (1 page(s), 11/3/2011)
- ML11318A158 - Drawing No. LR-STP-IA-8Q119F00048#2-1, Rev. 1, "Piping & Instrumentation Diagram Instrument Air/Service Air Compressors & Distribution." (1 page(s), 11/3/2011)
- ML11318A159 - Drawing No. LR-STP-IA-8Q119F05050#1, Rev. 1, "Piping & Instrumentation Diagram Mechanical Aux. Building Instrument Air." (1 page(s), 11/3/2011)
- ML11318A160 - Drawing No. LR-STP-IA-8Q119F05050#2, Rev. 1, "Piping & Instrumentation Diagram Mechanical Aux. Building Instrument Air." (1 page(s), 11/3/2011)
- ML11318A161 - Drawing No. LR-STP-MS-5S109F00016#1, Rev. 1, "Piping & Instrumentation Diagram Main Steam." (1 page(s), 11/3/2011)
- ML11318A162 - Drawing No. LR-STP-MS-5S109F00016#2, Rev. 1, "Piping & Instrumentation Diagram Main Steam." (1 page(s), 11/3/2011)
- ML11318A163 - Drawing No. LR-STP-PS-5Z329Z00045#1, Rev. 1, "Piping & Instrumentation Diagram Primary Sampling System." (1 page(s), 11/3/2011)
- ML11318A164 - Drawing No. LR-STP-PS-5Z329Z00045#2, Rev. 1, "Piping & Instrumentation Diagram Primary Sampling System." (1 page(s), 11/3/2011)
- ML11318A165 - Drawing No. LR-STP-PS9Z329Z00047#1, Rev. 1, "Piping and Instrumentation Diagram Primary Sampling System." (1 page(s), 11/3/2011)
- ML11318A166 - Drawing No. LR-STP-PS-9Z329Z00047#2, Rev. 1, "Piping and Instrument Diagram Primary Sampling System." (1 page(s), 11/3/2011)
- ML11318A167 - Drawing No. LR-STP-RC-5R149F05004#1, Rev. 1, "Piping and Instrumentation Diagram RCS Pressurizer Relief Tank." (1 page(s), 11/3/2011)
- ML11318A168 - Drawing No. LR-STP-RC-5R149F05004#2, Rev. 1, "Piping and Instrumentation Diagram ACS Pressurizer Relief Tank." (1 page(s), 11/3/2011)
- ML11318A169 - Drawing No. LR-STP-RM-5R279F05033#1, Rev. 1, "Piping & Instrumentation Diagram Reactor Makeup Water System." (1 page(s), 11/3/2011)
- ML11318A170 - Drawing No. LR-STP-RM-5R279F05033#2, Rev. 1, "Piping & Instrumentation Reactor Makeup Water System." (1 page(s), 11/3/2011)
- ML11318A171 - Drawing No. LR-STP-WL-5R309F05022#1, Rev. 1, "Piping and Instrumentation Diagram Liquid Waste Processing System." (1 page(s), 11/3/2011)
- ML11318A172 - Drawing No. LR-STP-WL-5R309F05022#2, Rev. 1, "Piping and Instrumentation Diagram Liquid Waste Processing System." (1 page(s), 11/3/2011)
- ML11318A173 - Drawing No. LR-STP-WL-5R309F05027#1, Rev. 1, "Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (LWPS). (1 page(s), 11/3/2011)
- ML11318A174 - Drawing No. LR-STP-WL-5R309F05027#2, Rev. 1, "Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (LWPS). (1 page(s), 11/3/2011)
- ML11318A175 - Drawing No. LR-STP-WL-7R309F05024#1, Rev. 1, "Piping an Instrumentation Diagram Liquid Waste Processing System". (1 page(s), 11/3/2011)
- ML11318A176 - Drawing No. LR-STP-WL-7R309F05024#2, Rev. 1, "Piping and Instrumentation Diagram Liquid Waste Processing System". (1 page(s), 11/3/2011)
- ML11318A177 - Drawing No. LR-STP-WL-7R309F90001#1, Rev. 1, "Piping and Instrumentation Diagram Liquid Waste Processing System". (1 page(s), 11/3/2011)
- ML11318A178 - Drawing No. LR-STP-WL-7R309F90021#1, Rev. 1, "Piping and Instrumentation Diagram Liquid Waste Processing System". (1 page(s), 11/3/2011)
- ML11318A179 - Drawing No. LR-STP-WL-7R309F90021#2, Rev. 1, "Piping and Instrumentation Diagram Liquid Waste Processing System". (1 page(s), 11/3/2011)
- ML11318A180 - Drawing No. LR-STP-WS-6R329F05048#1, Rev. 1, "Piping and Instrumentation Diagram Solid Waste Processing System". (1 page(s), 11/3/2011)
- ML11318A181 - Drawing No. LR-STP-WS-6R329F05048#2, Rev. 1, "Piping and Instrumentation Diagram Solid Waste Processing System". (1 page(s), 11/3/2011)
- ML11318A182 - Drawing No. 1218E40, "Fuel Transfer System Hydraulic Power Unit Outline". (1 page(s), 11/3/2011)
- ML11318A183 - Drawing No. LR-STP-SB-7S209F20003#1, Rev. 0, "Piping and Instrumentation Diagram Steam Generator Blowdown System". (1 page(s), 11/3/2011)
- ML11318A184 - Drawing No. LR-STP-SB-7S209F20003#2, Rev. 0, "Piping and Instrumentation Diagram Steam Generator Blowdown System". (1 page(s), 11/3/2011)