Home > NRC Library > ADAMS Public Documents
Diablo Canyon Units 1 and 2, License Amendment Request 11-07 Process Protection System Replacement.
Accession Number: ML113070457
Date Released: Monday, November 7, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11307A331 - Diablo Canyon Units 1 and 2, License Amendment Request 11-07 Process Protection System Replacement. (4 page(s), 10/26/2011)
- ML11307A332 - Evaluation of the Proposed Change License Amendment Request 11-07 Process Protection System Replacement. (410 page(s), 10/26/2011)
- ML15099A060 - Attachment 1: List of Regulatory Commitments. (6 page(s), 10/26/2011)
- ML11307A333 - Attachment 7: 08-0015-SP-001, Rev 4, "Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Functional Requirements Specification (FRS), Revision 4 (LAR Reference 28)." (80 page(s), 8/31/2011)
- ML15099A061 - Attachment 2: DI&C-ISG-06 Enclosure B Matrix. (26 page(s), 10/26/2011)
- ML15099A062 - Attachment 3: Diablo Canyon Power Plant Process Protection System (PPS) Replacement Concept, Requirements, and Licensing Phase 1 Project Plant, Revision 1 (LAR Reference 57). (29 page(s), 10/26/2011)
- ML15099A063 - Attachment 4: Rev. 0 to "Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement System Quality Assurance Plan (SyQAP) Nuclear Safety Related." (44 page(s), 10/26/2011)
- ML15099A064 - Attachment 5: Rev. 0 to "Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement System Verification and Validation Plan (SyVVP) Nuclear Safety Related." (23 page(s), 10/26/2011)
- ML15099A065 - Attachment 6: Rev. 4 to "Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Conceptual Design Document." (60 page(s), 10/26/2011)
- ML13308B837 - Attachment 8: Revision 4 to "Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Interface Requirements Specification, Nuclear Safety-Related." (51 page(s), 8/31/2011)
- ML13308B839 - Attachment 9: Revision 1 to 10115-J-NPG, "Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification." (32 page(s), 3/9/2011)
- ML13308B830 - Attachment 10: Revision 1 to "Diablo Canyon Power Plant Units 1 & 2 Human System Interface (HSI) Development Guidelines." (27 page(s), 6/6/2008)
- ML13308B832 - Attachment 11: Revision 8 to Procedure CF2, "Computer Hardware, Software and Database Control." (9 page(s), 8/16/2011)
- ML13308B834 - Attachment 12: Revision 10 to CF2.ID2, "Software Configuration Management For Plant Operations and Operations Support." (22 page(s), 10/26/2011)
- ML13308B835 - Attachment 13: Inter-Departmental Administrative Procedure CF2.ID9, Rev. 2, "Software Quality Assurance for Software Development." (23 page(s), 10/26/2011)