Home > NRC Library > ADAMS Public Documents
Transmission Supporting Files, Evaluation and Management of Materials Dredged from the Cross Florida Barge Canal for the Constriction of Barge Slip, Intake Structure, and Pipeline Facilities Associated with the Levy Nuclear Plant, Florida.
Accession Number: ML113040027
Date Released: Monday, October 31, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11290A198 - Transmittal of 338884-TMEM-129, "Evaluation and Management of Materials Dredged from the Cross Florida Barge Canal for the Constriction of Barge Slip, Intake Structure, and Pipeline Facilities Associated with the Levy Nuclear Plant, Florida". (28 page(s), 9/30/2011)
- ML11290A199 - Transmittal of 338884-TMEM-130, Rev 1, "Functional Evaluation of Wetlands for the Alternative Sites, Levy Nuclear Plant, Florida," Cover Page through Figure 4.2.8-18. (54 page(s), 9/30/2011)
- ML11290A200 - 338884-TMEM-130, Rev 1, "Functional Evaluation of Wetlands for the Alternative Sites, Levy Nuclear Plant, Florida," Attachment B, Aerial Photographs from LEDPA (3388-TMEM-102, Rev 4). (31 page(s), 9/30/2011)
- ML11290A201 - Transmittal of 338884-TMEM-131, Rev 1, "Effects of Temporary Dewatering on Wetlands for the Construction of the Levy Nuclear Plant, Levy County, Florida". (36 page(s), 9/30/2011)
- ML112930032 - Progress Energy, Submittal of First Set of Responses to Letter dated June 23, 2011 Regarding Positions, Comments and Requests for Information. . (13 page(s), 9/20/2011)