Watts Bar, Unit 2 - Instrumentation & Controls Staff Information Requests.
Accession Number: ML112870587
Date Released: Wednesday, October 19, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11287A254 - Watts Bar, Unit 2 - Instrumentation & Controls Staff Information Requests. (20 page(s), 9/30/2011)
- ML11287A255 - Report 3077-390572-001, Rev. 0, "Qualification Test Report for Environmental & Seismic Qualification of Weld Instrument Model DTN2010 Pressure Transmitters." (41 page(s), 8/10/2011)
- ML11291A039 - Report 04508903-1TR, "Seismic Qualification Test Results, RM-1000 & Current-to Frequency (I/F) Converter." (793 page(s), 4/7/1999)
- ML11287A256 - Non-Proprietary Version of GA-ESI Test Report 04508905-QR, Rev. A, "Qualification Test Report for RM-1000 Processor Module & Current-To-Frequency Converter." (132 page(s), 2/10/2011)
- ML11287A251 - EQ-QR-39-WBT-NP, Revision 1, Watts Bar NSSS Completion Program, "Equipment Qualification Summary Report for WINCISE Signal Processing System." (51 page(s), 9/30/2011)
- ML11287A252 - WNA-AR-00180-WBT-NP, Rev. 2, "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Failure Modes & Effects Analysis (FMEA) for the Post Accident Monitoring System." (51 page(s), 2/28/2011)
- ML11287A253 - DAR-ME-11-4-NP, "Qualification Summary Report for the Ex-Vessel Portion of the WINCISE In-Core Instrumentation Thimble Assembly (IITA) for Watts Bar Unit 2." (66 page(s), 9/30/2011)