Home > NRC Library > ADAMS Public Documents
Crystal River Unit 3 - Response to Request for Additional Information to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Uprate LAR.
Accession Number: ML112860156
Date Released: Friday, October 21, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11286A092 - Crystal River, Unit 3 - Response to Request for Additional Information to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Uprate LAR. (20 page(s), 10/11/2011)
- ML11286A093 - Crystal River, Unit 3, Calculation 86-9159609-002, "CR-3 Steam Generator Tube Rupture Event for EPU Summary." (157 page(s), 9/20/2011)
- ML11286A094 - Crystal River, Unit 3, Calculation 86-9167251-001, "Summary of CR3 EPU Inadvertent Pressurizer Relief Valve Opening." (29 page(s), 9/13/2011)
- ML11286A095 - Crystal River, Unit 3, Calculation 86-9168766-001, "CR-3 EPU Inadvertent Engineered Safeguards Actuation (IESA) Analysis Summary." (70 page(s), 9/22/2011)