Home > NRC Library > ADAMS Public Documents
SECY-11-XXXX: Supporting Documents.
Accession Number: ML112780085
Date Released: Friday, October 28, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML112780091 - Implementation of Part 70 Revision. (2 page(s), 10/25/2011)
- ML112780094 - Revised Fuel Cycle Oversight Program. (1 page(s), 10/25/2011)
- ML112780101 - Interagency Jurisdictional Working Group Evaluating Regulation of Low-Level Source Materials or Materials Containing Less Than 0.05 Percent by Weight Concentration Uranium and/or Thorium. (2 page(s), 10/25/2011)
- ML112780103 - Initiative: Determine Need for Separate Rule to Risk-Inform Part 50. (2 page(s), 10/25/2011)
- ML112780108 - Small Modular Reactor Activities. (1 page(s), 10/25/2011)
- ML112780115 - Data Collection for Human Reliability Analysis. (2 page(s), 10/25/2011)
- ML112780121 - Develop and Apply Methods for Assessing Fire Safety in Nuclear Facilities. (6 page(s), 10/25/2011)
- ML112780125 - Establish Guidance for Risk-informed Regulation: Development of Human Reliability Analysis. (7 page(s), 10/25/2011)
- ML112780129 - Digital Instrumentation and Control Probabilistic Risk Assessment. (3 page(s), 10/25/2011)
- ML112780131 - Fire Protection for Nuclear Power Plants. (3 page(s), 10/25/2011)
- ML112780132 - Risk Inform Emergency Action Levels. (1 page(s), 10/25/2011)
- ML112780134 - Maintenance and Development of SAPHIRE. (2 page(s), 10/25/2011)
- ML112780135 - Risk Informing Emergency Preparedness Oversight: Performance Based Offsite Response Organization Evaluation. (1 page(s), 10/25/2011)
- ML112780136 - PRA Quality Expectations. (4 page(s), 10/25/2011)
- ML112780138 - PRA Quality Expectations: Treatment of Uncertainties. (2 page(s), 10/25/2011)
- ML112780141 - RASP: Risk Assessment of Operational Events Handbook. (1 page(s), 10/25/2011)
- ML112780144 - Requirements to Consider LOOP in Conjunction with Large LOCA - Rulemaking. (2 page(s), 10/25/2011)
- ML112780147 - Develop an Alternative Risk-Informed Approach to Special Treatment Requirements in 10 CFR Part 50. (1 page(s), 10/25/2011)
- ML112780162 - Risk-Informed Improvements to the Standard Technical Specifications. (2 page(s), 10/25/2011)
- ML112780178 - Risk-Informing Emergency Preparedness Oversight: Accident Scenarios for Oversight. (2 page(s), 10/25/2011)
- ML112780180 - Risk-Informing Regulatory Approach to Security. (1 page(s), 10/25/2011)
- ML112780184 - Rulemaking to Make Risk-Informed Changes to Loss-of Coolant Accident Technical Requirements; 10 CFR 50.46a, "Alternative Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors." (3 page(s), 10/25/2011)
- ML112780186 - Status of the Standardized Plant Analysis Risk Models. (6 page(s), 10/25/2011)
- ML112780191 - Prioritization of Standard Review Plans for Independent Spent Fuel Storage Installations and Dry Cask Storage Systems. (2 page(s), 10/25/2011)