Home > NRC Library > ADAMS Public Documents
NUREG-1537, Parts 1 & 2, Chapters 7-18, Draft Interim Staff Guidance for Radioisotopes Production Facilities.
Accession Number: ML112720043
Date Released: Thursday, April 12, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML112720109 - General Notice, FRN - Availability of Draft Interim Staff Guidance Augmenting NUREG-1537 Part 1 and NUREG-1537 Part 2 Chapters 7-18 Only - Guidance for Radioisotope Production Facility License Applicants". (5 page(s), 4/3/2012)
- ML111570224 - Draft Interim Staff Guidance Augmenting NUREG-1537, Part 1, Chapters 7-18, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content" for the Production of Medical Isotopes. (78 page(s), 4/3/2012)
- ML111160065 - Draft Interim Staff Guidance Augmenting NUREG-1537, Part 2, Chapters 7-18, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, for the Production of Radioisotopes. (63 page(s), 4/3/2012)