Home > Site Help > Search Results
Fort Calhoun, Unit 1 - Draft Request for Additional Information, Amendment Request to Establish Ultimate Heat Sink LCOs in Technical Specification (TS) 2.16, "River Level," and Add Surveillance Requirements to TS 3.2, "Equipment and Sampling Tests."
Accession Number: ML112590332
Date Released: Monday, September 19, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML112590334 - Fort Calhoun, Unit 1 - E-mail, Draft Request for Additional Information, Amendment Request to Establish Ultimate Heat Sink LCOs in TS 2.16, "River Level," and Add Surveillance Requirements to TS 3.2, "Equipment and Sampling Tests" (TAC No. ME5830). (1 page(s), 9/16/2011)
- ML112590339 - Fort Calhoun, Unit 1 - Draft Request for Additional Information, Amendment Request to Establish Ultimate Heat Sink LCOs in TS 2.16, "River Level," and Add Surveillance Requirements to TS 3.2, "Equipment and Sampling Tests" (TAC No. ME5830). (3 page(s), 9/16/2011)