Home > NRC Library > ADAMS Public Documents
FOIA/PA-2011-0264 - Resp 1 - Final.
Accession Number: ML112371618
Date Released: Thursday, September 1, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11237A056 - FOIA/PA-2011-0264 - Resp 1 - Final. (1 page(s), 8/24/2011)
- ML051570442 - Indian Point Units 2 and 3, Response to NRC Guidance for Use in Achieving Satisfactory Compliance With February 25, 2002 Order EA-02-026, Section B.5.b. (3 page(s), 5/31/2005)
- ML052990031 - Response to NRC Request for Additional Information RE: February 2002, Order Section B.5.b for Indian Point. (2 page(s), 10/19/2005)
- ML11158A119 - 2-ECA-0.0, Rev. 7, "Loss of All AC Power." (29 page(s), 4/29/2011)
- ML11158A121 - 3-ECA-0.0, Rev. 5, "Loss of all AC Power." (54 page(s), 5/4/2011)
- ML111320311 - IR 05000247/2011009; 04/18/2011 - 04/27/2011; Indian Point Nuclear Generating Unit 2; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event. (28 page(s), 5/13/2011)
- ML111310606 - IR 05000286/2011009; 04/18/2011 - 04/27/2011; Indian Point Nuclear Generating Unit 3; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event. (23 page(s), 5/13/2011)
- ML111470361 - Region I Completion of Temporary Instruction (TI)-184, "Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (SAMGs)." (54 page(s), 5/27/2011)
- ML11172A107 - Indian Point, Units 1 and 2 - 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (4 page(s), 6/10/2011)
- ML060540486 - Indian Point Response to NRC Phase 2 Assessment of Spent Fuel Pools. (6 page(s), 2/9/2006)
- ML060590067 - Indian Point, Units 2 &3 - Response to Report of Inspection of Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b, Temporary Instruction 2515/164; NRC Inspection Report 05000247-2005-010 and 05000286-2005-008. (3 page(s), 2/23/2006)
- ML062780152 - Indian Point - Mitigation Strategy Assessments and Closure Process for Phases 1, 2, and 3. (7 page(s), 10/13/2006)
- ML070220153 - Disposition of Mitigation Strategies Identified During Phase 2 and Phase 3 (Enclosure 3). (1 page(s), 10/13/2006)
- ML071700242 - Indian Point, Units 2 & 3 - Additional Information Regarding Implementation Details for the Phase 2 and 3 Mitigation Strategies. (3 page(s), 6/14/2007)
- ML11237A054 - Letter from F. Dacimo, Entergy to NRC on Response Providing Information Regarding Implementation Details for the Phase 2 and 3 Mitigation Strategies. (4 page(s), 1/11/2007)
- ML11237A055 - Letter from J. Rogge, NRR to J. Pollock, Entergy on Indian Point Units 2 and 3 - NRC Team Inspection Report 0500247/2008008 and 05000286/2008008. (10 page(s), 11/10/2008)