Home > NRC Library > ADAMS Public Documents
FY12(02/12) - 50247 Indian Point, Unit 2, Initial Exam (Fac Dev) (U01844).
Accession Number: ML112350689
Date Released: Friday, November 6, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML112411212 - Senior Reactor and Reactor Operator Initial License Examinations - Indian Point 2. (4 page(s), 8/29/2011)
- ML120300321 - Initial Operator Licensing Operating Test and Written Examination Approval - Indian Point Unit 2. (4 page(s), 1/30/2012)
- ML12059A435 - Indian Point Station, Unit 2 - Draft Operating Exam (Sections A, B, and C) (Folder 2). (440 page(s), 2/13/2012)
- ML12059A370 - Indian Point Station, Unit 2 - NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2). (13 page(s), 2/13/2012)
- ML12059A449 - Indian Point Station, Unit 2 - Final Operating Exam (Sections A, B, and C) (Folder 3). (349 page(s), 2/6/2012)
- ML12059A360 - Indian Point Station, Unit 2 - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2). (3 page(s), 2/13/2012)
- ML12059A447 - Indian Point Station, Unit 2 - Final Written Examination with Answer Key (401-5 Format) (Format 2). (207 page(s), 2/14/2012)
- ML12059A434 - Indian Point Station, Unit 2 - Draft Written Exam (Folder 2). (205 page(s), 2/13/2012)
- ML12059A443 - Indian Point Station, Unit 2 - Final Outlines (Folder 3). (33 page(s), 8/16/2011)
- ML12059A366 - Indian Point Station, Unit 2 - Draft - Outlines (Folder 2). (35 page(s), 2/13/2012)
- ML12072A227 - Indian Point Station, Unit 2 - Post Exam Comments, Resolution, and Technical References (Folder 1). (17 page(s), 3/3/2012)
- ML12072A249 - Indian Point Station, Unit 2 - Final QA/Related Forms (Folder 1). (34 page(s), 3/8/2012)
- ML120760280 - Indian Point Unit 2 - NRC Initial and Retake Operator Licensing Examination Report 05000247/2012301. (12 page(s), 3/15/2012)
- ML12172A061 - Indian Point Station, Unit 2 - Corrected Final Outlines - Change to In-Plant JPM (Folder 3). (4 page(s), 6/12/2012)