West Valley Demonstration Project (WVDP) Permeable Treatment Wall (PTW) Documentation, 2010.
Accession Number: ML112140511
Date Released: Wednesday, August 3, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11214A176 - West Valley Demonstration Project (WVDP) Permeable Treatment Wall (PTW) Documentation, 2010. (4 page(s), 6/22/2011)
- ML11214A178 - Figure 8A - Performance Monitoring Network As Built PTW Performance Monitoring Plan West Valley Environmental Services, LLC, West Valley, New York. (1 page(s), 3/10/2011)
- ML11214A179 - WVDP Permeable Treatment Wall (Photo 11/01/10). (1 page(s), 11/1/2010)
- ML11214A180 - CBS New York - In-Ground Wall to Filter Water at N. Y. Nuke Site. (2 page(s), 10/17/2010)
- ML11214A181 - USA Today - "In-Ground Wall to Filter Water at NY Nuke Site". (2 page(s), 10/17/2010)
- ML11214A182 - Buffalo News - Tackling West Valley's Leaking Radiation, An Experimental Project to Filter Groundwater of Strontium-90 is about ready to be tested. (4 page(s), 10/22/2010)
- ML11214A183 - Olean Times Herald - "West Valley Cleanup Goes Heavy-Duty". (2 page(s), 10/23/2010)
- ML11214A184 - Springville Journal - "Groundwater at WVDP will be Filtered for Decades by Volcanic Rocks". (4 page(s), 10/27/2011)
- ML11214A185 - Press Release - "Radioactivity from Groundwater will be Filtered for Decades by Volcanic Rocks at Western New York Nuclear Waste Site". (2 page(s), 10/21/2010)
- ML11214A186 - Springville Journal - Treatment wall nearing completion at West Valley Demonstration Project. (2 page(s), 11/17/2010)
- ML11214A187 - Mitigation of the Contaminated Groundwater Plume at the West Valley Demonstration Project, New York, USA – 10409. (10 page(s), 3/11/2010)
- ML11214A188 - WVDP North Plateau Characterization To Support Design Of Strontium-90 Groundwater Plume Mitigation Measure. (584 page(s), 9/28/2009)
- ML11214A189 - Technology Evaluation of the Pilot Permeable Treatment Wall and Recommended Path Forward. (234 page(s), 8/2/2011)
- ML11214A190 - Laboratory Testing of Zeolitic Materials Submitted by Department of Civil, Structural and Environmental Engineering of the University of Buffalo. (562 page(s), 12/14/2009)
- ML11214A191 - Update: Laboratory Testing of Zeolitic Materials. (25 page(s), 8/30/2010)
- ML11214A192 - North Plateau Permeable Treatment Wall Performance Monitoring Plan. (102 page(s), 3/15/2011)
- ML11214A193 - North Plateau Permeable Treatment Wall Protection and Best Management Plan. (6 page(s), 9/14/2010)
- ML11214A194 - Mitigation of the Contaminated Groundwater Plume at the West Valley Demonstration Project, New York, USA - 10409. (18 page(s), 8/2/2011)
- ML11214A195 - Design and Installation of a Permeable Treatment Wall at the West Valley Demonstration Project to Mitigate Expansion of Strontium-90 Contaminated Groundwater - 11138. (12 page(s), 3/3/2011)
- ML11214A196 - Design and Installation of a Permeable Treatment Wall to Mitigate Expansion of Strontium-90 Contaminated Groundwater. (18 page(s), 2/27/2011)
- ML11214A197 - Final Laboratory Testing of Zeolitic Materials. (16 page(s), 1/27/2011)
- ML11214A198 - Focused Analysis of Remediation Alternatives for Groundwater Plume Expansion and Seepage to Surface Water - Final Revision 4. (118 page(s), 5/30/2007)
- ML11214A199 - North Plateau Permeable Treatment Wall Installation Quality Summary Plan. (13 page(s), 5/4/2010)
- ML11214A200 - 58 Miscellaneous Photographs. (58 page(s), 8/2/2011)