Home > NRC Library > ADAMS Public Documents
02/10/2011 Mitsubishi Heavy Industries Ltd. - Public Meeting on Human Factors Engineering and ITAAC for DCD Chapters 7 and 18.
Accession Number: ML112061906
Date Released: Wednesday, October 26, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML110270224 - 02/10/2011 Notice of Forthcoming Public Meeting With Mitsubishi Heavy Industries Ltd to Discuss the Review of the US-APWR Human Factors Engineering (HFE) Topical Report (MUAP-07007) and ITAAC Changes for HFE and Digital Instrumentation and Controls. (7 page(s), 1/28/2011)
- ML112900269 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.1 Basis Document. (10 page(s), 10/21/2011)
- ML112900271 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.2 Basis Document. (3 page(s), 10/21/2011)
- ML112890018 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.3 Basis Document. (3 page(s), 10/21/2011)
- ML112900001 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.4 Basis Document. (2 page(s), 10/21/2011)
- ML112900002 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.5 Basis Document. (1 page(s), 10/21/2011)
- ML112900004 - US-APWR Design Control Document, Tier 1: Pre-revision 3, Draft Changes Related to ITAAC, Section 2.9 Basis Document. (6 page(s), 10/21/2011)
- ML112900005 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.1. (31 page(s), 10/21/2011)
- ML112900006 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.2. (8 page(s), 10/21/2011)
- ML112900007 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.3. (13 page(s), 10/21/2011)
- ML112900008 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.4. (7 page(s), 10/21/2011)
- ML112900009 - US-APWR Design Control Document, Tier 1: Pre-Revision 3, Draft Changes Related to ITAAC, Section 2.5.5. (4 page(s), 10/21/2011)
- ML112900011 - US-APWR Design Control Document, Tier 1: Pre-revision 3, Draft Changes Related to ITAAC, Section 2.9. (17 page(s), 10/21/2011)
- ML110490566 - 02/17/2011, US-APWR DCD Tier 1 and ITAAC AM Session Meeting Handout 1 of 2. (44 page(s), 2/17/2011)
- ML112911400 - 02/10/2011 Summary of Meeting with Mitsubishi Heavy Industries, Ltd. to Discuss the Review of the United States - Advanced Pressurized Water Reactor Human Factors Engineering Topical Report (MUAP-07007) and Inspection, Test, Analysis. (8 page(s), 10/25/2011)