NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "1995 Interim Plugging Criteria 90-Day Rept." Rept provides SG bobbin voltage distribution summary, postulated SLB leak rate & tube burst probability results.

Accession Number: ML111822396

Date Released: Thursday, September 1, 2011

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer