NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation re Cycle XI reload core.Core design more conservative than design used in accident analysis.Cycle X - XI refueling outage scheduled to begin 850218.Cycle XI startup testing scheduled to begin 850418.

Accession Number: ML111660683

Date Released: Thursday, September 1, 2011

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer