04/28/2011 - Summary of Public Meeting to Discuss Changes During Construction, Preliminary Acceptability Review Process.
Accession Number: ML111390328
Date Released: Friday, May 20, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML110880570 - 04/28/11 - Notice of Forthcoming Public Meeting to Discuss Changes During Construction, Preliminary Acceptability Review Process. (4 page(s), 4/5/2011)
- ML111390360 - 04/28/11 - Summary of Public Meeting with Nuclear Energy Institute to Discuss Changes during Construction, Preliminary Acceptability Review Process. (5 page(s), 5/20/2011)
- ML111390369 - Enclosure 1 - Meeting Attendees List, Part 52 Changes During Construction, PAR Process Discussion. (1 page(s), 5/20/2011)
- ML111390385 - Enclosure 2 - Interim Staff Guidance COL-ISG-025 On Changes During Construction Under Part 52, Proposed Revision 1. (14 page(s), 5/20/2011)
- ML111390403 - Enclosure 3 - Changes During Construction NEI PAR Request Examples. (23 page(s), 5/20/2011)