Home > NRC Library > ADAMS Public Documents
Transmittal Letter for the Calvert Cliffs Nuclear Power Plant, Unit 3 Final Phase II Nontidal Wetland and Stream Mitigation Plan April 2011.
Accession Number: ML111190230
Date Released: Monday, May 2, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11119A101 - Transmittal Letter for the Calvert Cliffs Nuclear Power Plant, Unit 3 - Final Phase II Nontidal Wetland and Stream Mitigation Plan April 2011. (3 page(s), 4/18/2011)
- ML11119A105 - Calvert Cliffs Nuclear Power Plant, Unit 3 - Final Phase II Nontidal Wetland and Stream Mitigation Plan, TOC - Appendix A: 12 Critical Elements Summary. (82 page(s), 4/30/2011)
- ML11119A106 - Calvert Cliffs Nuclear Power Plant, Unit 3 - Final Phase II Nontidal Wetland and Stream Mitigation Plan, Appendix B: Final Design Plans through Appendix C: Existing and Proposed Conditions Hydrology Analysis Reports. (229 page(s), 4/30/2011)
- ML11119A102 - Calvert Cliffs Nuclear Power Plant, Unit 3 - Final Phase II Nontidal Wetland and Stream Mitigation Plan, Appendix A Figures of Model Representation and HEC-HMS Schematics through Appendix D, Fluvial Geomorphic Assessment Data. (146 page(s), 4/30/2011)
- ML11119A103 - Calvert Cliffs Nuclear Power Plant, Unit 3 - Final Phase II Nontidal Wetland and Stream Mitigation Plan, Appendix E: Calculations for Weir Design. (66 page(s), 4/30/2011)
- ML11119A104 - Calvert Cliffs Nuclear Power Plant, Unit 3 - Final Phase II Nontidal Wetland and Stream Mitigation Plan,Riffle Grade Control Design Sheet through End. (106 page(s), 4/30/2011)