NRC Logo

Home > NRC Library > ADAMS Public Documents

Handouts from Pre-application Meeting on 2/3/2011 with Representatives of Pacific Gas and Electric Company to Discuss Digital Upgrade and Eagle-21 Portion of Reactor Trip System at Diablo Canyon, Units 1 and 2 (TAC Nos. ME5284 and ME5285).

Accession Number: ML110380098

Date Released: Monday, February 7, 2011

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer