Home > NRC Library > ADAMS Public Documents
FOIA/PA-2010-0290 - Resp 5 - Partial.
Accession Number: ML103330292
Date Released: Wednesday, December 1, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML103330275 - FOIA/PA-2010-0290 - Resp 5 - Partial. (5 page(s), 11/23/2010)
- ML103330277 - Memorandum to Johnson from Jacobson and McKenna, Combined Quick-Look and Final Trip Report. (7 page(s), 2/26/2009)
- ML103330278 - Combined Quick Look and Final Trip Report. (5 page(s), 9/15/2009)
- ML103330279 - Memorandum to Johnson from Bergman, Combined Quick Look/Foreign Trip Report to Participate {Outside Scope} and China-United States Technical Workshop in Beijing, China October 14-22, 2009. (13 page(s), 10/29/2009)
- ML103330276 - AP1000 Public Meeting on Shield Building Design Methodology. (10 page(s), 1/20/2010)
- ML103330280 - E-Mail from John Ma, ABAQUS Concrete Model. (51 page(s), 1/22/2010)
- ML103330281 - Post-Mission Quick Look Report. (8 page(s), 3/31/2010)
- ML103330282 - E-Mail from Ma to Chunlin, Phone Call on the in-plane shear test. (3 page(s), 4/7/2010)
- ML103330283 - E-Mail from Patel to Chunlin, E-mail address from Chunlin-Hou. (3 page(s), 4/26/2010)
- ML103330284 - E-Mail from Lu to Donoghue, ICONE-18 Day 1 - One Significant Item. (1 page(s), 5/17/2010)
- ML103330339 - E-Mail from Ma to Chunlin, About the PCS Tank. (1 page(s), 5/17/2010)
- ML103330340 - E-Mail from Lu to Donoghue, ICONE-18 Day 2 One Significant Item - Follow-up. (1 page(s), 5/18/2010)
- ML103330341 - E-Mail from Ma to Chunlin, About the PCS Tank. (3 page(s), 5/18/2010)
- ML103330342 - E-Mail from Lu to Donoghue, ICONE-18 Day 3 Report. (1 page(s), 5/19/2010)
- ML103330343 - E-Mail from Lu to Donoghue, ICONE-18 Day 4 - Report. (2 page(s), 5/22/2010)
- ML103330344 - E-Mail from Gilanshahi to Gilanshahi, Presentation, Crystal River 3. (21 page(s), 9/8/2010)
- ML103330345 - E-Mail from Ma to Chunlin, Request for help. (4 page(s), 7/13/2010)
- ML103330346 - E-Mail from Ma to Chunlin, re Request for Help, Preparing Information to Brief Office Deputy Director. (2 page(s), 7/13/2010)
- ML103330347 - E-mail from Ma to Chunlin, One question from Chunlin. (3 page(s), 8/6/2010)
- ML103330348 - E-Mail from Ma to Chunlin, One question from Chunlin. (3 page(s), 8/6/2010)
- ML103340203 - E-mail from Ma to Chunlin, Thanks from Chunlin. (2 page(s), 8/12/2010)
- ML103340204 - Memorandum to Johnson from Jacobson, Combined Quick-Look and Final Trip Report. (7 page(s), 11/13/2008)
- ML103340205 - Memorandum to Johnson from Jacobson and McKenna, Combined Quick-Look and Final Trip Report. (7 page(s), 2/26/2009)
- ML103340206 - Memorandum to Johnson from Tracy, Foreign Trip Report on US NRC Staff visit to China for Meetings with the National Nuclear Safety Administration of China and Visits to AP1000 Manufacturing and Construction Sites. (10 page(s), 12/1/2009)
- ML103340207 - Post-Mission Quick Look Report. (4 page(s), 3/25/2010)
- ML103340208 - Memorandum to Mallet and Doane from Johnson, Foreign Trip Report on USNRC Staff Visit to China for Meetings with the NNSA of China and Visits to AP1000 Manufacturing and Construction Sites. (10 page(s), 4/20/2010)
- ML103340209 - Memorandum to Tracy from Jacobson, Combined Quick Look/Foreign Trip Report on USNRC Staff Visit to China for Meetings with the NNSA and Observation of Inspection Activities at the Sanmen Nuclear Power Plant. (8 page(s), 5/4/2010)