Home > NRC Library > ADAMS Public Documents
Transmittal of GEH Licensing Topical Reports NEDE-33516P-A, "ESBWR Qualification Plan Requirements for 72-Hour Duty Cycle Battery," Rev 2, Sept 2010 & NEDO-33516-A, "ESBWR Qualification Plan Requirements for 72-Hour Duty Cycle Battery," Rev 2, Sept 2010.
Accession Number: ML102880497
Date Released: Monday, October 25, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML102880498 - Transmittal of GEH Licensing Topical Reports NEDE-33516P-A, "ESBWR Qualification Plan Requirements for 72-Hour Duty Cycle Battery," Rev 2, Sept 2010 & NEDO-33516-A, "ESBWR Qualification Plan Requirements for 72-Hour Duty Cycle Battery," Rev 2, Sept 2010. (2 page(s), 10/1/2010)
- ML102880499 - NEDO-33516-A, Revision 2, "ESBWR Qualification Plan Requirements for a 72-Hour Duty Cycle Battery," Enclosure 2 to MFN 10-285. (30 page(s), 9/30/2010)