Home > NRC Library > ADAMS Public Documents
FOIA/PA-2010-0334 - Resp 1 - Partial.
Accession Number: ML102871201
Date Released: Thursday, October 14, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML102871184 - FOIA/PA-2010-0334 - Resp 1 - Partial. (3 page(s), 10/5/2010)
- ML101540242 - Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application for Buried Piping Inspection Program (TAC Nos. ME1834 and ME1836). (4 page(s), 8/6/2010)
- ML102560064 - Salem, Unit 1 and 2, Response to NRC Request for Additional Information, dated August 6, 2010 Related to the Buried Piping Inspection Program Associated with License Renewal Application. (24 page(s), 9/7/2010)
- ML101100101 - Task Interface Agreement - Evaluation of Application of Technical Specification Surveillance Requirement 3.0.3, "Surveillance Requirement Applicability," at Clinton Power Station (TIA 2010-001). (6 page(s), 4/19/2010)
- ML080300554 - Task Interface Agreement (TIA) - Request for Evaluation of Intended Application of Technical Specification (TS) Limiting Condition for Operation (LCO) 3.0.5 for Surveillance Testing of Reactor Protection System (RPS) Channels at Arkansas Nuclear One. (9 page(s), 1/30/2008)
- ML102871196 - Email from Ed Miller, NRR to Rick Ennis, NRR and Carleen Sanders, NRR on Summary of AFW Piping Call. (2 page(s), 4/16/2010)
- ML102871197 - Email from James Medoff, NRR to David Pelton, NRR and William Holston, NRR FW: OpE Item on Salem 1 AFW Buried Piping. (3 page(s), 4/19/2010)
- ML102871198 - Email from Robert Hardies, NRR to David Alley, NRR RE: Salem AFW Summary. (4 page(s), 5/6/2010)
- ML102871199 - Email from Prakash Patnaik, NRR to Rick Ennis, NRR on Salem Unit 2 AFW Buried Piping Pressure Test. (2 page(s), 5/7/2010)