Home > NRC Library > ADAMS Public Documents
Millstone, Unit 2 Resubmittal of Westinghouse Documentation Supporting License Amendment 249, "Changes to the Steam Generator Inspection Scope and Repair Requirements.
Accession Number: ML102850433
Date Released: Wednesday, October 20, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML102850435 - Millstone, Unit 2 Resubmittal of Westinghouse Documentation Supporting License Amendment 249, "Changes to the Steam Generator Inspection Scope and Repair Requirements. (7 page(s), 10/7/2010)
- ML102850438 - Attachments 2, 3, 5, 7, 8 & 9, to 10-579A, Westinghouse Electric Co. LLC, WCAP-17071-NP, "H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F)," Revision 2, Dated September 2010. (480 page(s), 9/30/2010)