Home > NRC Library > ADAMS Public Documents
Grand Gulf, Unit 1, License Amendment Request Extended Power Uprate.
Accession Number: ML102660409
Date Released: Friday, October 1, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML102660403 - Grand Gulf, Unit 1, License Amendment Request Extended Power Uprate. (123 page(s), 9/8/2010)
- ML102660405 - Extended Power Uprate Environmental Assessment. (101 page(s), 9/8/2010)
- ML102660399 - NEDO-33477, Revision 0, "Safety Analysis Report for Grand Gulf Nuclear Station Constant Pressure Power Uprate." (537 page(s), 8/31/2010)
- ML102660400 - GE-Hitachi Nuclear Energy Americas LLC - Affidavit of Edward Schrull re: Withholding from Public Disclosure Proprietary Report NEDC-33477P. (142 page(s), 8/20/2010)
- ML102660401 - NEDO-33601, Revison 0, "Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using PBLE Methodology." Cover Through Appendix A. (319 page(s), 9/30/2010)
- ML102660406 - NEDO-33601, Revison 0, "Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using PBLE Methodology." Appendix B Through Appendix D. (126 page(s), 9/30/2010)
- ML102660407 - NEDO-33601, Revison 0, "Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using PBLE Methodology." Appendix E Through Appendix G. (256 page(s), 9/30/2010)
- ML102660408 - Grid Stability Evaluation. (267 page(s), 9/8/2010)