Home > NRC Library > ADAMS Public Documents
04/28-29/2010 - Forthcoming Category 3 Public Meeting to Discuss Rulemaking Effort to Modify the Emergency Core Cooling System Acceptance Criteria and to Discuss a Prospective Generic Letter Related to Fuel Cladding Embrittlement.
Accession Number: ML101180006
Date Released: Wednesday, April 28, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML100970778 - 04/28-29/2010 - Forthcoming Category 3 Public Meeting to Discuss Rulemaking Effort to Modify the Emergency Core Cooling System Acceptance Criteria and to Discuss a Prospective Generic Letter Related to Fuel Cladding Embrittlement. (6 page(s), 4/8/2010)
- ML101180008 - 04/28-29/2010 NRC Public Workshop Slides, "10 CFR 50.46 ECCS Acceptance Criteria Rulemaking: Background, Objectives, and Schedule." (7 page(s), 4/28/2010)
- ML101180009 - 04/28-29/2010 NRC Public Workshop Slides, "Revision to 10 CFR 50.46(b) ECCS Performance Requirements." (25 page(s), 4/28/2010)
- ML101180010 - 04/28-29/2010 NRC Public Workshop Slides, "Elements of an Information Request Related to ECCS Performance." (6 page(s), 4/29/2010)
- ML101180012 - 04/28-29/2010 NRC Public Workshop Slides, "Elements of Prospective Information Request: Potential Embrittlement of Fuel Rods During Postulated Loss-of-Coolant Accidents." (4 page(s), 4/28/2010)