Home > NRC Library > ADAMS Public Documents
Comanche Peak, Units 3 and 4, Documents to Support Requests for Additional Information No. 4308, 4309, 4310, 4311, 4312, 4313, 4314, and 4315.
Accession Number: ML100750040
Date Released: Thursday, March 25, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML100750042 - Comanche Peak, Units 3 and 4, Documents to Support Requests for Additional Information No. 4308, 4309, 4310, 4311, 4312, 4313, 4314, and 4315. (3 page(s), 3/3/2010)
- ML100750044 - TUXT-001-FSAR-2.4.3-CALC-012, Rev. 1, Reference 11. Texas Utilities Services, Inc., Comanche Peak, Units 1 and 2, CPSES 1980-1982, "Safe Shutdown Impoundment Dam Design Calculations and Calculations Check, Volume 1. (216 page(s), 8/14/2009)
- ML100750047 - TUXT-001-FSAR-2.4.3-CALC-012, Rev. 1, Reference 12. Texas Utilities Services, Inc., Comanche Peak, Units 1 and 2, CPSES 1980-1982, "Safe Shutdown Impoundment Dam Design Calculations and Calculations Check, Volume 2. (231 page(s), 8/14/2009)
- ML100750048 - TUXT-001-FSAR-2.4.3-CALC-012, Rev. 1, Reference 13. The Texas Water Development Board, "Volumetric Survey for Squaw Creek Reservoir," Prepared by the Brazos River Authority and Texas Utilities, September 11, 1997. (45 page(s), 8/14/2009)
- ML100750051 - TUXT-001-FSAR-2.4.3-CALC-012, Rev. 1, Reference 14. Freese and Nichols, Operation and Maintenance Procedures, Squaw Creek Dam, Fort Worth, Texas, 1977. (54 page(s), 8/14/2009)
- ML100750052 - TXUT-001-FSAR 2.4.2-CALC-020, Rev. 2, "Analysis of the Effects of Local Intense Precipitation at the Comanche Peak Nuclear Power Plant Units 3 and 4." (37 page(s), 8/14/2009)
- ML100750054 - TXUT-001-FSAR 2.4.2-CALC-020, Rev. 1, "Probable Maximum Precipitation Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 Using HMR 51 & HMR 52," Cover through Page 70 of 180. (101 page(s), 8/14/2009)
- ML100750055 - TXUT-001-FSAR 2.4.2-CALC-020, Rev. 1, "Probable Maximum Precipitation Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 Using HMR 51 & HMR 52," Page 71 of 180 through End. (110 page(s), 8/14/2009)
- ML100750057 - TXUT-001-FSAR 2.4.3-CALC-012, Rev. 1, "Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS)." (503 page(s), 8/14/2009)
- ML100750059 - TXUT-001-FSAR-2.4.3-CALC-013, Rev. 2, "Coincident Wind Wave Analysis for Comanche Peak Nuclear Power Plant Units 3 and 4." (21 page(s), 11/20/2009)
- ML100750064 - TXUT-001-FSAR-2.4.4-CALC-015, Rev. 0, "Brazos River Dam Failures Analysis for Comanche Peak Nuclear Power Plant Units 3 and 4." (58 page(s), 8/25/2008)
- ML100750066 - TXUT-001-FSAR 2.4.7-CALC-029, Rev 0, "Accumulated Freezing Degree Days and Maximum Potential Ice Sheet Thickness for Comanche Peak Nuclear Power Plant Units 3 and 4." (9 page(s), 8/14/2009)