Home > NRC Library > ADAMS Public Documents
Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, "AC Sources - Operating."
Accession Number: ML100710731
Date Released: Monday, March 22, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML100710749 - Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, "AC Sources - Operating." (33 page(s), 3/11/2010)
- ML100710751 - Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-10-028, History DCPP PRA Model Development and Update. (20 page(s), 3/11/2010)
- ML100710753 - Diablo Canyon, Units 1 and 2, Attachment 5 to DCL-10-028, Summary Statement of Diablo Canyon Power Plant PRA Model Capability for Use in TS 3.8.1 Completion Time Extension Submittal. (7 page(s), 3/11/2010)
- ML100710755 - Diablo Canyon, Units 1 and 2, Attachment 6 to DCL-10-028, Impacts of PRA Open Items/Gaps on Application. (28 page(s), 3/11/2010)