Home > NRC Library > ADAMS Public Documents
Forwards application for amend to license DPR-64,revising TS Section 4.3 & basis,permitting RCS leak test to be performed at normal operating pressure following each refueling outage in lieu of hydrostatic test at 2,335 psig.
Accession Number: ML100471267
Date Released: Tuesday, June 1, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML100471266 - Forwards application for amend to license DPR-64,revising TS Section 4.3 & basis,permitting RCS leak test to be performed at normal operating pressure following each refueling outage in lieu of hydrostatic test at 2,335 psig. (2 page(s), 4/26/1996)
- ML100471268 - Application for amend to license DPR-64,revising TS Section 3.4 & basis,permitting RCS leak test to be performed at normal operating pressure following each refueling outage in lieu of hydrostatic test at 2,335 psig. (2 page(s), 4/26/1996)
- ML100471269 - Proposed tech specs Section 4.3, "RCS Integrity Testing," permitting RCS leak test to be performed at normal operating pressure following each refueling outage,in accordance w/ requirements of ASME Section XI. (7 page(s), 4/26/1996)