NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards RO Insp Rept 50-286/74-12 for action.Preoperational testing procedures for ECCS does not include testing of accumulator isolation valves under differential pressure conditions per Reg Guide 1.79,Paragraph C.3.c(2).

Accession Number: ML100270905

Date Released: Thursday, October 24, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer