Home > Site Help > Search Results

Forwards "Indian Point 3 Cycle 2 Eighteen (18) Case FAC Reanalysis" Since validity of analysis predicated on restricting Cycle 1 operation to below 91% full rated power, PASNY commits to 91% power level.

Accession Number: ML100251322

Date Released: Tuesday, June 1, 2010

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer