Forwards AO-75-2-15(B) & AO-75-2-16(B).
Accession Number: ML093561134
Date Released: Tuesday, June 1, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML093561133 - Forwards AO-75-2-15(B) & AO-75-2-16(B). (2 page(s), 9/3/1975)
- ML093561135 - AO-75-2-15(B):on 750804,during cold shutdown for outage, containment spray pump functional test not performed as required.Caused by breakers,required to be operable for test,being isolated to provide worker protection. (1 page(s), 9/3/1975)
- ML093561136 - AO-75-2-16(B):on 750805,during cold shutdown for outage, reactor protection logic channel test not performed as required.Caused by breakers,required to be operable for test,being isolated to provide worker protection. (1 page(s), 9/3/1975)