NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards revised Westinghouse STS 3.9.8.2,3.9.10 & Bases 3/4 9.8 & 3/4 9.10 to require 23 ft of water over top of reactor pressure vessel flange during movement of fuel assemblies or control rods.Written response required.

Accession Number: ML093430304

Date Released: Thursday, October 24, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer