NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation accepting extension of insp of LP-1 & LP-3 turbine discs to Cycle 7/8 refueling outage because estimated turbine missile probability in Oct 1990 satisfies turbine reliability criteria.

Accession Number: ML093420247

Date Released: Thursday, October 24, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer