Home > NRC Library > ADAMS Public Documents
03/26/09, Notice of Meeting With Florida Power and Light Company to Discuss Underground Injection Control and Site Seismic Characteristics of Turkey Point for Proposed AP1000 Pressurized Water Reactor, Units 6 & 7.
Accession Number: ML093340004
Date Released: Monday, November 30, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML090420048 - 03/26/09 Notice of Meeting With Florida Power And Light Company to Discuss Underground Injection Control and Site Seismic Characteristics of Turkey Point for Proposed AP1000 Pressurized Water Reactor, Units 6 & 7. (7 page(s), 2/19/2009)
- ML091130079 - 03/26/2009 Meeting Summary, Category 1 Public Meeting with Florida Power and Light Co. to Discuss Underground Injection Control, Limited Work Authorization Overview, & Seismic Characteristics of Turkey Point Site for the Proposed AP1000 PWR Units 6 & 7. (8 page(s), 4/21/2009)
- ML090960663 - Hydrology Site Features, Turkey Point, Units 6 & 7. (22 page(s), 3/26/2009)
- ML090960683 - Turkey Point, Units 6 & 7, Limited Work Authorization Final. (11 page(s), 3/26/2009)
- ML090960671 - Turkey Point, Units 6 & 7, Operational Program Considerations. (9 page(s), 3/26/2009)
- ML090960657 - Turkey Point, Units 6 & 7, Underground Injection Control. (25 page(s), 3/26/2009)