Home > NRC Library > ADAMS Public Documents
Browns Ferry, Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Revised Unit 2 Steam Dryer Report.
Accession Number: ML093200294
Date Released: Tuesday, November 24, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML093200268 - Browns Ferry, Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Revised Unit 2 Steam Dryer Report. (3 page(s), 11/5/2009)
- ML093200269 - CDI Report No. 09-13NP, Rev. 1, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements," Cover Page - Page 62. (68 page(s), 10/31/2009)
- ML093200270 - CDI Report No. 09-13NP, Rev. 1, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements," Page 62 through 119. (60 page(s), 10/31/2009)