NRC Logo

Home > NRC Library > ADAMS Public Documents

09/29/2009 Summary of Public Meeting with Industry to Discuss Draft Interim Staff Guidance (DC/COL-ISG-020) on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors.

Accession Number: ML092580354

Date Released: Thursday, October 22, 2009

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer