Home > NRC Library > ADAMS Public Documents
Browns Ferry, Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Response to Round 24 Request for Additional Information (RAI) EMCB.208 Regarding Steam Dryer Analyses (TAC No. MD5262).
Accession Number: ML092440383
Date Released: Thursday, September 10, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML092440372 - Browns Ferry, Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Response to Round 24 Request for Additional Information (RAI) EMCB.208 Regarding Steam Dryer Analyses (TAC No. MD5262). (9 page(s), 8/28/2009)
- ML092440373 - CDI Report No. 09-24NP, Rev. 0, "Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer to 110% OLTP Power Level", Cover through Chapter 4 (Non-proprietary Version). (46 page(s), 8/31/2009)
- ML092440374 - CDI Report No. 09-24NP, Rev. 0, "Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer to 110% OLTP Power Level", Chapter 5 through End (Non-proprietary Version). (56 page(s), 8/31/2009)
- ML092440375 - C.D.I. Report No. 09-22NP, Rev. 0, "Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level to 110% OLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz" (Non-proprietary Version) (46 page(s), 8/31/2009)