Home > NRC Library > ADAMS Public Documents
Web package for FOIA/PA-2009-0192
Accession Number: ML092220248
Date Released: Tuesday, August 11, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML091590348 - FOIA/PA-2009-0192 - All documentation re: inspection heads and/or control rod drive mechanisms and related components of Indian Point Units 2 and 3, incl. insp plans, insp results, condition reports, component susceptibility & corrective actions. (2 page(s), 6/8/2009)
- ML091940274 - FOIA/PA-2009-0192 - Resp 1 - Final. (4 page(s), 7/10/2009)
- ML080440260 - Indian Point, Unit 2 - Reactor Vessel Lower Head Inspection Plans. (4 page(s), 1/31/2008)
- ML081790154 - Indian Point, Unit 2, Transmittal of Reactor Pressure Vessel (RPV) Upper Head Inspection Results, Spring 2008 Refueling Outage (2R18). (5 page(s), 6/19/2008)
- ML091330468 - Indian Point, Units 2 and 3 - Foreign Obligations Regarding Replacement Reactor Vessel Closure Heads. (2 page(s), 5/4/2009)
- ML071510183 - Indian Point, Unit 3 - Submittal of Reactor Vessel Lower Head Inspection Results for Spring 2007 Refueling Outage. (6 page(s), 5/22/2007)
- ML071510185 - Indian Point, Unit 3 - Reactor Vessel Upper Head Inspection Results; Spring 2007 Refueling Outage (3R14). (6 page(s), 5/22/2007)
- ML090420062 - Indian Point, Unit 3, Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection Program. (17 page(s), 1/22/2009)
- ML071300525 - IR 05000286-07-002; on 01/01/2007 - 03/31/2007; Indian Point, Unit 3; NRC Integrated Inspection Report. (60 page(s), 5/10/2007)
- ML082260281 - IR 05000247-08-003, on 04/01/2008 - 06/30/2008; Indian Point Unit 2; Operability Evaluations; Evaluations of Changes, Tests, or Experiments; Plant Modifications; Followup of Events; and Other Activities. (62 page(s), 8/13/2008)