Home > NRC Library > ADAMS Public Documents
Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs dated March 12, 2009.
Accession Number: ML091410117
Date Released: Friday, July 31, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML091410120 - Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs dated March 12, 2009. (24 page(s), 5/13/2009)
- ML091410121 - Monticello - Calculation CA-95-073, Revision 4, "Reactor Low Water Level SCRAM Setpoint". (72 page(s), 12/19/2008)
- ML091410122 - Monticello - Calculation CA-95-075, Revision 1, "Main Steam Line High Flow Setpoint". (166 page(s), 12/18/2008)
- ML091410123 - Monticello - Calculation 96-054, Rev 5, "Turbine Stop Valve Closure/Generator Load Reject Scram Bypass". (51 page(s), 5/6/2009)
- ML091410124 - Monticello - Calculation CA-08-050, Rev. 0, "Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased PRNM Setpoints for CL TP and EPU". (63 page(s), 8/11/2008)
- ML091410125 - Monticello, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, "Average Power Range Monitor Selected PRNM Licensing Setpoints - EPU Operation (NUMAC)". (26 page(s), 5/31/2009)